collector well construction

persons in charge:

Mr Radke head of department Mr Huber project manager
Tel: 0049 621 69004-90 email: radke.bernd@bhg-brechtel.de Tel: 0049 621 69004-95 email: huber.mirko@bhg-brechtel.de



our services:

construction of caissons
construction of horizontal laterals / drainages by using "PREUSSAG-Kiesmantel-method" (artificially flushed in gravel pack)
rehabilitation and reconstruction of existing collector wells and horizontal laterals / drainages



applications:

wells for supply of drinking and process water
facilities for permanent lowering of ground water
rehabilitation of contaminated (polluted) areas/aquifers
ground water diversion systems (ground water siphons)
supply of geothermal and cooling facilities



WHD-Drilling Method

BHG Brechtel invented a new registered drilling method for 480 mm horizontal drilling in water saturated aquifers. The developing process went on for nearly three years and was administrated by the inventor, Mr. Horst Derwand in close cooperation with the engineering company IB Dieterle. Notable companies of Mechanical Engineering and IT-Technology took part in this development because of their contribution of technical knowledge and mechanical skills.

get
more information




references:

BHG Brechtel GmbH is constructing Radial Collector Wells for more than 50 years. (see history of BHG)

Our list of references shows a number of more than 220 RCWs (or horizontal water catchments) constructed worldwide in the following countries:

Germany (163)
Austria (15)
Netherlands (12)
Switzerland (5)
Turkey (4)
USA (3)
Mexico (3)
Serbia (1)


More detailed information about some projects you can find on page references/ reference projects.