THE ASSIGNMENT

Restoration and replacement of seepage water drains with minimized airation of the landfill body during contruction time.

Working under polluted / contaminated conditions by using the necessary safety regulation standards (for example german BRG 128).

Pinpoint sinking of the shafts down to ca. 60 m below ground level.




THE SOLUTION

Sinking of two shafts (tandem shaft) made of steel pipes having an inner diameter of 2500 mm with a distance off 2,0 m to each other down to the basement of the landfill.

Installing a tunnel as a connection between the two shafts on the bottom in order to facilitate the necessary space for bending radius of the new HDPE-pipes.

Restoration / replacement of seepage water drains by static/dynamic berstlining over a distance up to 120 m.


flyer Tandem-Shaft-Method [2.047 KB] (english version)