Salina Cruz, RCW supplies a desalination plant
|
|
|
|
directly at the beach of the pacific ocean ...
|
three RCW's were constructed to collect seawater. Therefore the caissons were sunk directly on the beach. The laterals were installed like a fan towards the ocean. Instead of construction of an open intake the advantage of this design was to collect salt water precleaned by the aquifer.
|
|
|
|
Technical Data of the Collector Well:
|
depth of caissons: 30 - 36 m inner diameter of the caisson: 5,00 m
number of laterals: 7 each length of laterals: 40 m - 60 m drilling diameter: 464 mm dimension of screens: 290 mm (material : 316 L) typ of screens: bridge slotted screens, surrounded with an artificially flushed in gravel pack (PREUSSAG Kiesmantel Method)
|
|
|
back to main page reference projects/collector well construction
|